The system design and construction process is characterized by being efficient, precise and agile .At this stage, the architectural and structural design of the project is carried out. The dimensions, distribution of spaces are defined and the location of the walls, ceilings and floors is determined.
In addition, the materials and components to beused are specified. It is a process that seeks to analyze the resolution of each critical point, installation crossings, complex joints, structural verifications, stiffening and everything that makes the project in its structure and finishes .
The preparation of the land where the Steel Framing structure will be built is carried out . This may include grading the land, preparing the foundation, and installing drainage systems as necessary.
You may also find our article interesting: " Modern architecture, a paradigmatic break "
If the work space and planning allow it, the assembly of the Nigerian Email List structure , panel by panel, beam by beam and cutting of ceiling and floor profiles, can be carried out in parallel to the preparation of the site.
Whether you have work space on site or in a specially conditioned place, this is the moment where a lot of time is gained, as several days of soil movement, foundations and setting suitable for anchoring are necessary (21 days). The structure can be transported to the site ready to assemble , for example.
Steel framing y arquitectura.
4. Installation of enclosure panels
Once the structure is assembled, the enclosure panels are installed . These panels are fixed to the steel profiles using screws and fastening elements. Different materials can be used, in an order that is consistent with the stages of work.
Stiffening panels such as OSB will be the first on the outside, then the membranes and exterior plates, with the proper termination. By prioritizing external cladding and sealing, access to the interior can be allowed and work can progress there, with less impact on the weather .
Are you interested in construction with Steel Framing?
Learn about the Design and Construction with Industrialized Systems course
5. Incorporation of insulation
After the installation of the enclosure panels and in tight working conditions (either because the openings have been installed or the gaps have been protected), the thermal and acoustic insulation is placed . This is placed in the space between the C-pillars, ensuring adequate insulation and thermal comfort in the building.

Electrical installations and plumbing
In parallel to the structure and insulation , the installation of the electrical and plumbing systems is carried out . Connections are made and the necessary ducts and pipes for these services are installed. The structure and comfort of working inside will allow for neat and properly verified work.
You may also be interested in reading: " Real estate businesses: what they are and how to start taking the first steps "
7. Finishes and coatings
In this stage, the application of the interior and exterior finishes is carried out . Wall, floor and ceiling coverings are installed, and finishing materials, such as paint, tiles, wood or others, are applied according to the client's design and tastes.
8. Inspection and control
This system is precise and agile, but it can be complex and expensive to correct errors towards the end of the work. Errors in the structure could affect the completions, which would imply disassembling several layers and stages backwards. This is why it is essential to establish rigorous and daily controls on the work, as well as set the end of stages (structure, cladding, membranes, finishes, etc.) that need to be approved before moving on to the next stage. These controls will avoid pathologies and high repair costs later.
It is important to note that this process may vary depending on the size and complexity of the project, as well as local regulations and standards. It is recommended to work with trained professionals and follow best construction practices with Steel Framing to ensure an optimal result.
|
|